Fawcett Street is an 82-bed student accommodation development located in the heart of York.
Fawcett Street is a newly built 82-bed Purpose-Built Student Accommodation (PBSA) scheme, incorporating high-quality communal amenity spaces. Future Power Systems delivered the full MEP design and installation, including heating, ventilation, domestic water services, photovoltaic systems, electrical distribution, life-safety systems, and integrated controls.
Achieving an Energy Rating of A, Fawcett Street was designed and constructed with energy efficiency and resident comfort at its core, And this is felt throughout the development, ensuring the building continues to be a comfortable, welcoming, safe and eco friendly place to live and socialise for generations of students to come.


